Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Purpose
This procedure establishes the minimum requirements for lockout of energy sources that could cause injury to personnel. All employees shall comply with the procedure. Responsibility
The responsibility for seeing that this procedure is followed is binding upon all employees. All employees shall be instructed in the safety significance of the lockout procedure by (designated individual). Each new or transferred affected employee shall be instructed by (designated individuals) in the purpose and use of the lockout procedure.
Preparation for Lockout
Employees authorized to perform lockout shall be certain as to which switch, valve, or other energy isolating devices apply to the equipment being locked out. More than one energy source (electrical, mechanical, or others) may be involved. Any questionable identification of sources shall be cleared by the employees with their supervisors. Before lockout commences, job authorization should be obtained.
Sequence of Lockout Procedure
1) Notify all affected employees that a lockout is required and the reason therefor.
2) If the equipment is operating, shut it down by the normal stopping procedure (such as: depress stop button, open toggle switch).
3) Operate the switch, valve, or other energy isolating devices so that the energy source(s) (electrical, mechanical, hydraulic, other) is disconnected or isolated from the equipment.
4) Lockout energy isolating devices with an assigned individual lock.
5) Stored energy, such as that in capacitors, springs, elevated machine members, rotating fl y wheels, hydraulic systems, and air, gas, steam or water pressure, must also be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down.
6) After ensuring that no personnel are exposed and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate. CAUTION: Return operating controls to neutral position after the test.
7) The equipment is now locked out.
Restoring Equipment to Service
1) When the job is complete and equipment is ready for testing or normal service, check the equipment area to see that no one is exposed.
2) When equipment is clear, remove all locks. The energy isolating devices may be operated to restore energy to equipment.
Procedure Involving More Than One Person
In the preceding steps, if more than one individual is required to lock out equipment, each shall place his/her own personal lock on the energy isolating device(s). One designated individual of a work crew or a supervisor, with the knowledge of the crew, may lock out equipment for the whole crew. In such cases, it may be the responsibility of the individual to carry out all steps of the lockout procedure and inform the crew when it is safe to work on the equipment. Additionally, the designated individual shall not remove a crew lock until it has been verified that all individuals are clear.
Rules for Using Lockout Procedure
All equipment shall be locked out to protect against accidental or inadvertent operation when such operation could cause injury to personnel. Do not attempt to operate any switch, valve, or other energy isolating device bearing a lock
Copyright © 2022 Strategic Construction Solutions - All Rights Reserved.
Powered by GoDaddy Website Builder
This website uses cookies. By continuing to use this site, you accept our use of cookies.