Fill out a GOOD CATCH

SCS Safe
SCS Safe
  • Home
  • Projects
    • AWS #2 Substation
    • Tower Solar
    • Biglow Solar
    • CMH 220
    • CMH 205
    • AWS #3 Substation
    • SEP 200
  • Incidents
  • Safety Data Sheets
  • Training
  • Printable Forms
  • COVID-19
  • Key Procedures
    • Use of PPE
    • Lock Out Tag Out
    • Confined Space
    • Fall Protection
  • Manuals
  • Request Forms
  • SWPPP & BMP's
  • Color Codes
  • 811
  • Contacts
  • SCS Happenings
  • More
    • Home
    • Projects
      • AWS #2 Substation
      • Tower Solar
      • Biglow Solar
      • CMH 220
      • CMH 205
      • AWS #3 Substation
      • SEP 200
    • Incidents
    • Safety Data Sheets
    • Training
    • Printable Forms
    • COVID-19
    • Key Procedures
      • Use of PPE
      • Lock Out Tag Out
      • Confined Space
      • Fall Protection
    • Manuals
    • Request Forms
    • SWPPP & BMP's
    • Color Codes
    • 811
    • Contacts
    • SCS Happenings
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Projects
    • AWS #2 Substation
    • Tower Solar
    • Biglow Solar
    • CMH 220
    • CMH 205
    • AWS #3 Substation
    • SEP 200
  • Incidents
  • Safety Data Sheets
  • Training
  • Printable Forms
  • COVID-19
  • Key Procedures
    • Use of PPE
    • Lock Out Tag Out
    • Confined Space
    • Fall Protection
  • Manuals
  • Request Forms
  • SWPPP & BMP's
  • Color Codes
  • 811
  • Contacts
  • SCS Happenings

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Confined Space Checklist

Confined Space

Confined Space Entry Procedure Checklist

Step #               Process 

1. Isolate the Space from all hazards

       a. Remove unauthorized personnel form the site of entry

       b. LOTO

       c. Blocking inlets, etc.

2. Ventilate the space (if required)

3. Fill out the Entry Permit

4. Evaluate the space

5. Test the atmosphere

      a. Enter atmosphere readings on the permit

      b. Place the completed permit on or near the PRCS

7. Enter the space and proceed with work

      a. Is Supervisor available?

      b. Attendant at the entry site

      c. Harness

      d. Required PPE

      e. Retest atmoshpere as needed / required

8. When the job is done:

      a. Remove all personnel, tools and debris from the space.

      b. Close the space

      c. Cancel the permit

      d. Review the job with the employer (hazards, problems, etc.)

9. File the completed and closed permit

Warning sign for confined space entry with permit required.

Warning sign for confined space entry with permit required.

Copyright © 2022 Strategic Construction Solutions  - All Rights Reserved.

Powered by

Cookie Policy

This website uses cookies. By continuing to use this site, you accept our use of cookies.

Accept & Close

National Preparedness Month

Be Ready Before You Need To Be - Emergencies can happen anytime. Discover practical tips, resources, and actions you can take now to stay safe and prepared.

Click Here to Read More